Have you built something without council approval? Or discovered an existing structure on your property that was never approved?
Engineering On Demand provides Retrospective Building Approval Perth services to help property owners address unauthorised building works, missing permits and existing structures requiring council approval.
Whether you’re dealing with an unapproved patio, shed, extension, retaining wall or other structure, our team can assist with structural assessments, engineering documentation, building surveying coordination and the applicable retrospective approval process.
Our aim is to establish what is required, identify any structural or compliance concerns and help you move towards obtaining the appropriate approval.
Building work does not always go through the appropriate approval process before construction. Sometimes a structure was installed by a previous owner, an extension was completed without the necessary permits or a property inspection reveals that council has no record of an existing improvement.
In Western Australia, a retrospective approval pathway may be available for certain unauthorised building works.
Retrospective Council Approval Perth involves assessing the existing work and establishing what planning, building and technical documentation is required to seek approval after construction.
Engineering On Demand can assist with identifying the relevant requirements, reviewing existing structures and preparing engineering documentation where necessary.
The aim is to address the outstanding approval requirements rather than leave an unauthorised structure unresolved.
Review the structural elements, support conditions and available documentation to identify whether engineering assessment or further investigation is required.
Provide engineering reports, calculations or drawings where necessary to support assessment of the completed work.
Identify the relevant building and planning requirements and assist with coordinating the documentation required for submission.
Unauthorised building work can include a structure constructed without a required Building Permit, work that differs from approved plans or structural alterations completed without the necessary authorisation.
Before submitting an application, it is important to establish whether the work actually required approval, what was previously authorised and whether the completed construction satisfies the applicable requirements.
Engineering On Demand can help review these matters and identify the technical information needed to support the appropriate retrospective approval process.
The first step is reviewing the completed structure, its intended use and any existing council approval records.
This may involve reviewing photographs, building plans, dimensions, construction details and the condition of visible structural elements.
Depending on the structure, an engineer may need to assess how the existing construction supports the loads imposed upon it.
This can involve reviewing footings, posts, beams, connections, bracing, retaining walls and other structural components.
Where existing approved drawings are unavailable, as-constructed documentation may be needed to demonstrate what has actually been built.
These drawings can include site plans, elevations, structural details and other information relevant to the application.
A building surveyor may need to assess the completed work against the relevant building standards and supporting documentation.
Engineering reports and other specialist assessments may be required to support that review.
Retrospective building approval and retrospective planning approval are not the same process.
Depending on the structure, its location and the applicable planning controls, a separate retrospective development application may be necessary.
Once the required assessments and supporting documents have been completed, the appropriate application can be prepared for submission to the relevant local government or permit authority.
Additional information or rectification work may still be required before approval can be granted.
Retrospective planning approval deals with development or land use that commenced without the required development approval.
An existing patio, outbuilding, extension or other development may require a planning assessment if it does not satisfy an applicable exemption or the relevant planning requirements.
The process considers matters such as setbacks, building height, site coverage, land use, privacy and other relevant planning controls.
Planning approval does not replace building certification. Where both planning and building approvals are required, each pathway must be addressed.
Retrospective building approval focuses on completed construction and whether the relevant building approval requirements can be satisfied.
For many residential Class 1 and Class 10 buildings and structures, this involves a Building Approval Certificate application supported by a Certificate of Building Compliance issued by a registered building surveyor.
Structural engineering assessments, drawings and other specialist documentation may be required before the building surveyor can complete the compliance assessment.
Engineering On Demand can assist with the engineering components and coordination of the approval documentation.
For many existing residential buildings and Class 10 structures, the relevant retrospective building approval pathway involves a BA13 Application for Building Approval Certificate.
The BA13 application is generally supported by a BA18 Certificate of Building Compliance, prepared by a registered building surveyor, together with the drawings and technical information relied upon for certification.
If the application is accepted and approved, the permit authority issues the Building Approval Certificate, commonly identified as BA14.
Engineering On Demand can provide structural assessment and engineering documentation where required and assist with coordinating the supporting information.
For commercial and other Class 2–9 buildings, an occupancy permit pathway may apply instead.
IMPORTANT: RETROSPECTIVE APPROVAL IS NOT AUTOMATIC. Existing work may require further investigation, modification or removal where it cannot satisfy the applicable requirements. Obtaining retrospective approval also does not automatically eliminate liability for earlier unauthorised work.
Patios are sometimes constructed without the necessary Building Permit or without documentation demonstrating how the roof, posts and connections have been designed.
A retrospective application may require drawings and an assessment of the existing patio structure.
Depending on the circumstances, modifications may be necessary before the completed work can be accepted.
An existing shed may require retrospective approval where construction was undertaken without a required permit.
The assessment can involve the shed’s dimensions, location, footings, structural framing, bracing and connections.
The relevant planning and building requirements need to be considered before submitting an application.
Retaining walls can introduce structural and site risks where the original design and construction details are unknown.
Retrospective approval may require a structural assessment addressing retained soil, wall height, drainage, foundations and surrounding conditions.
Further investigation may be necessary where important structural components are concealed.
Extensions and additions can change the way loads are transferred through an existing building.
Where construction was completed without the necessary approval, engineering assessments may be required to review the additional structure and its connections to the original home.
Building and planning compliance may also need to be addressed.
Removing a load-bearing wall without appropriate engineering can affect the structural performance of a building.
An assessment may need to consider the installed beam, bearing points, posts, connections and the remaining load path.
Additional strengthening or corrective work may be required where the existing construction is inadequate.
Unapproved structures may be discovered during the sale or purchase of a property.
Resolving the approval status can help establish whether documentation is missing, retrospective approval is available or rectification work is necessary.
Starting the process early may help reduce uncertainty during a property transaction.
A local government may contact a property owner about building work that appears to have been undertaken without the necessary approval.
The appropriate response depends on the council’s notice, the structure and the relevant requirements.
Engineering and building compliance assessments can help establish what steps may be needed to address the matter.
A BA13 application is commonly used to seek a Building Approval Certificate for unauthorised residential and Class 10 building work.
The application must be supported by the required building surveying certification and other relevant documentation.
Ensuring the supporting information is complete can reduce unnecessary delays.
A completed structure may not necessarily satisfy the relevant structural requirements simply because it has remained standing.
Engineering assessment can help identify deficiencies in connections, footings, framing or other structural components.
Where issues are identified, recommendations for further investigation or rectification may be required before certification can proceed.
Retrospective building approval is a process used to seek approval for certain existing buildings or structures where work was undertaken without the required authorisation. The applicable pathway depends on the building classification, the work completed and the relevant regulations.
Potentially. Western Australia provides retrospective approval pathways for certain unauthorised work. Approval depends on the relevant planning, building and compliance requirements and is not guaranteed.
You should first establish whether the work required approval and whether any existing permits are recorded. If approval was required and was not obtained, a retrospective application may be necessary.
BA13 is the WA application form used to apply for a Building Approval Certificate. It is commonly associated with retrospective approval for unauthorised Class 1 and Class 10 building work.
BA13 is the application for a Building Approval Certificate. BA18 is the Certificate of Building Compliance issued by a registered building surveyor and used to support the application.
Not every retrospective application requires the same engineering input. However, a structural assessment or engineering report may be necessary where structural adequacy must be demonstrated or where the building surveyor requires additional technical evidence.
No. Planning approval relates to development and land-use controls, while building approval addresses the relevant building requirements. Some existing structures may require both approvals.
No. A structural engineer can provide relevant technical assessments, reports and documentation, but the appropriate permit or approval is issued by the responsible authority. Building surveying certification is a separate professional function.
A retrospective approval pathway may be available, depending on the circumstances. Structural adequacy, planning requirements and the existing construction may need to be reviewed before the application can progress.
An existing structure may have missing approval records even where the current owner did not originally undertake the work. The approval history and current requirements should be reviewed to determine the appropriate next steps.